Monday, March 22, 2010

What Does It Mean Man Pierced Nipple



This was the motto of the proposal presented to the ideas competition held by the City of Archena for the construction of the new council, which was awarded a special mention.

In an analysis of the scope of action and of its surroundings yields the following conclusions :

1. Acted in a confluence three of tours most important urban area (Avd del Carril, avd. Daniel Ayala and ctra. The Spa). Opposite the proposed plot is " green lung " Archena the Jardinillo. The large gap that exists at the edge of it and the existence of inadequate access make today is a disused orchard.

2. The Plaza on May 1 is not connected with little garden and plaza with the new council, being lined road of traffic.

3. The main facade of the school Miguel Medina is the little garden opposite, ie the building turns its back this great park.

4. The building the House of Culture and Teatro-Cine is an obstacle for the little garden offered to the mouth of the lane. This building is accessible from a street with a section enough to be a crowded public building, while providing a facade to the park clearly inappropriate. Note the presence of possible conditions for the existence of cracks in the facade.

5. The building Vicente Medina Institute is in a state of deterioration considerable. With the entry into force of new regulations and advances in new technologies together to build a new school in Archena get even more apparent the shortcomings of this building for the use you have.

6. The avd. Daniel Ayala is mostly unconfigured by the presence of a perimeter fence of the school courtyard.

7. There is no public parking , and also the rail, consists of buildings (some of them in height) that mostly have no basements, and therefore there is a lot of homes that lack of parking spaces.

8. Both public buildings as the areas of business and labor are scattered throughout the urban fabric is unclear or its location or the interplay between them.

9. We propose a scope minded center , not only by the strategic position within the municipality but by the existence of social mores around this area that make the place May 1 and Lane are a common ground of citizenship in their leisure time.

10. In surroundings is Villarías the Mansion of the summer and Film Municipal Pool.



With data base arises the need to rethink the scope of . Attractive and necessary to take this opportunity to intervene in the school Miguel Medina area to solve the environment problems that exist. It will therefore be interesting to propose a joint action, ranging from Daniel Ayala Avenue to Municipal Pool and Film Summer, a performance that set the great center that Archena need to resolve border issues of little garden, integrating the square on May 1 as the park and the new town hall square and offering the little garden at the mouth with the track, serving as clear and unimpeded path to the swimming pool and into the summer movie, thus generating a good connection between the public spaces as powerful by the municipality.

Therefore, the purpose of the proposal will be set archena center , space relationship of the inhabitants, the core activity of the municipality.

optimal functioning of the city center is achieved by grouping administrative, commercial, labor, leisure, cultural, ..., leading to further build the City Hall and Cultural Center, spaces for shops and offices.

The proposed framework for the new City Hall is suitable to establish itself as the main element of the village center. However, the direction of the proposal shows that the existing building is not best suited to set the front of this great urban space and which has its main front entrance with your back to it. Drawing on the conclusions of the environment the poor positioning of the house of culture and movie theater and the deteriorating state of the institute Miguel Medina raises a piece that addresses both the front of the great urban space created as the front of the new square created in front of the existing building. It should also resolve the facade of the plot from high school to avd. Daniel Ayala. In this piece in the shape of "Z" City Council resolved to occupy the dominant position of urban space, the Theatre-Cinema, closing the space created in front of the existing building and the new facade to institute giving avd. Daniel Ayala. The existing building will become the new Centro Cultural Miguel Medina and the house of culture is built on this plot would bring down an office building that allows us to give space to set direct access and comfortable surroundings of the palace and the little garden. Under the main part lies a basement for parking.

is vital for the proposal to solve the problems of the little garden border. It introduces a grandstand that aterraza the resulting gap. Living space outdoors, an intermediate stage between the town hall square, the Plaza on May 1 and the park. In turn generates a horizontal access from the lane to facilitate the influx of people at once without having to negotiate steep slopes. Thus no longer the fence and the park offers to the city.


The proposed commercial activity concentrated in the center of Archena and generating a large commercial surfaces that are offered in this space. Much of the front of the avd. Daniel Ayala on the ground floor and the Town Hall Square is intended to commercial premises (shops, cafes, entertainment ,...). Downstairs there are also entrances to the City Council, the Institute and the Theatre-cinema.

The existing building is intended to Cultural Center and is divided into house plant culture library floor and first floor. It seems interesting that use of the building remains which historically has had a cultural use, educational.

The City Hall building has four floors and the program is resolved considering that the city be as close as possible the services of more competition for the taxpayer.

The movie theater is solved with a foyer on the ground floor and a room for almost five hundred people on the first floor.



s.


The new institute is accessed from the avn. Daniel Ayala, being allowed out into the yard from access, and solving the classrooms and teaching areas in first and second floor.

entire basement of this piece is to use parking and is accessible from the avn. Daniel Ayala and from the c / Dr. Fleming. There is capacity for 200 parking spaces and the possibility of pedestrian exit the town hall square and avd. Daniel Ayala.

The office building has four floors that are mostly offices. On the ground floor are shops linked to the terraces to the little garden (cafeteria, recreation, ...)

The proposal offers access to Municipal Pool through the little garden. Building access control that would fall to a first level connected to the terrace bar of Pool and a second level directly connected to the changing rooms and access to the pool.

Finally we raise the pedestrian center, making a study of alternative routes for traffic and thus freeing the circulation of citizens between the free spaces.


ECONOMIC PROPOSAL

The purpose of the contest is to build Archena the New Town Hall. To this end, approximately 3,000,000 intended .

as was manifest justification the solution, an optimum operation of the center of the city is achieved by grouping administrative, commercial, labor, leisure, cultural, ..., which involves building addition to the City Council and Cultural Center, spaces for shops and offices.

The possibility that these applications can coexist in the center of Archena going to study the feasibility of a proposal that in absolute value is close to 13,000,000 .

proposal " Archena center " consists of a council 4,130 m² , a center cultural 1,600 m² , a movie theater 1,355 m² , institute 4,160 m² , 4,850 m² office , 1,900 m² of commercial , 7,500 m² parking would amount to 250 parking spaces, new access to the swimming pool from the little garden, the urbanization of entire pedestrian area above and the completion of demolition of both the home and the school culture current.

must therefore consider research that lead to the need to resolve to build that much-needed center Archena no middle ground, and without imposing an unaffordable cost for the municipality, covering the scope necessary for that purpose and together to solve the needs of the city and the citizen. The way forward is to the SELF-FINANCING

Conducting a market survey, sales prices of both local commercial as offices in avd. lane are:

Commercial 2,500 / m²

Offices 1,800 € / m²

Garages 12,000 / m²

For estimates has avoided the revaluation of the area after the actions proposed and used sales prices of approximately 85% of the control market in order to obtain a conservative result. The deal values \u200b\u200bare:

Commercial 2,200 / m²

Offices 1500 / m²

Garajes 10,000 / m²

You can sell the resulting surface of shops, offices and parking spaces remaining (130 pc) and 12,755,000 obtained , enough to finance all INTERVENTION without using the 3,000,000 proposed by the City.

A comprehensive proposal Archena center configuration , self-financing and likely developed in phases to control the investment based on the development of sales proposals.

Monday, March 8, 2010

Jaw Hurts When Drinking Wine

archena central city water. Past and present of life around the spring. Opening

In 2003, the Spa Archena a competition of ideas for conducting a parking, a leisure area and a new access to the pool complex recently created . Our study was the winner of it and then began the design phase of the project.
since 1751, knows that under the current building there is a Roman spa, due to the discovery of a tombstone which referred to the duoviros rebuilt the resort. In 2001 there was a whole column of travertine that fit well with the old descriptions of finds of fragments of columns. Be in 2003 when the first archaeological excavation carried out under the current programmed thermal Gallery, directed and documented by archaeologist D. Gonzalo Matilla Seiquer. Their findings allowed us to establish a first hypothesis of the global configuration of the Roman baths, and offered a sense of vitality and potential of the complex might have Idc century early 2005 a further series of surveys near the spring where pavements are slabs of stone, remains of columns and a votive inscription. This excavation confirmed that the works in the complex from s. XIX very significantly altered remains of earlier buildings, being the foundation of existing buildings supported directly on the Roman remains. These findings suggest at first that the existence of archaeological remains will concentrate on the existing spa before enlargement (hotels, chapel and casino).



The main objective of our proposal was to set the urban fabric of this "city of water" contained in the resort of archena. The complex was in the process of enlargement and we played part in the gap created between the old spa resort (hotels, chapel, casino, ...) and the newly created (pools, saunas, ...). We based the proposal on the creation of an outdoor space connected to the garden-minded town square, where activity is concentrated leisure outside the complex and serves as a "ball" to link the two parts of the spa. We also propose a number of circulations of two different levels that allow us to connect the existing complex (comparable to the old town) with the building of new creation. Almost all users of the resort accessible by car, which means that the new main entrance to the resort is the parking lot, making it the distribution point to all spa users (shops, swimming pools, gardens, hotels, superior ride, ...). This implies pedestrianise those parts of the city where car use can cause harmful interference to users (hotels area, chapel, ...). Respect for existing vegetation, work-based slope terracing to minimize the visual impact of the proposal and maximize views of the valley, the use of moving water through the gaps and make the earthy appearance building is integrated in a place where the mountain vegetation and the river up the landscape (the heart of the Ricote Valley.)

In mid 2005, work began parking in an area within complex where it was not very predictable existence of archaeological remains, both the distance and thermal water birth and found the remains as steep as the place. Yet when it began earthmoving some remains were uncovered. After his study concludes that it is an oven that can be part of an industrial complex annex to the spa building with little presence. It was decided to dismantle and remove stone by stone to its conservation. Work continued and a few days are a number of stones were analyzed by archaeologist suggest that you can try new Roman remains to be documented. When it becomes apparent the magnitude of the findings, the property become aware of the respect and appreciation of heritage, we are responsible for modifying the project to respect them and put them in value, including within the proposed architecture. the remains appeared to show that we service facilities Roman complex, which after the first major flood were turned in part on public buildings (temple, curia). Joined mansio these structures appears most likely intended to increase the accommodation capacity of the spa in a moment of maximum splendor of it. Attached to the mansions, at a higher level displayed the remains of a possible mill. Features a powerful perimeter wall pier protection against flooding. In the stratigraphic reads very clearly both the first flood that destroyed the original spa and the second that led to its abandonment. Finally note the presence of several water structures in nature as a "castellum aquae" of Roman, a Ferris wheel and over the s Arabic century, a canal built around the s. Dc VI and a IV.dc century tomb and several tombstones.



The original proposal raises two different connections to the area level between the newly created and existing spa. The space relationship and leisure with a large plaza stood at the bottom. With the appearance of the remains this solution is feasible if we want to value the archaeological findings. Therefore, we propose to raise the relationship space and recreation area linking it to the upper level circulation. This creates a large plaza covering the remains and environment which is developed around the proposed recreational use (cafeteria, recreation, celebrations, ...). We are therefore creating a large space that serves as a link between the two areas of the resort and where it will perform most of the outdoor activity of the complex. (Shows, playground, café terrace, walking area, viewpoint towards the valley of Ricote, ...). On the leisure proposes the construction of an administrative area and some apartments.





From the orchard level access to the building that houses both the museum and shopping area, parking and access control. The museum consists of three very distinct parts. The first would be the interpretation room, opposite the shops and starting point of the museum display. It is a room open to the wreckage where the visitor will all the information needed for input into the contents of the museum (audiovisual, handouts, etc.).. From the first room a walkway that runs along part of the excavation perimeter terminating in a staircase that brings you into the wreckage. In background, a glass facade that exposes both the archaeological garden as the Ricote Valley. We seek here to show simultaneously both structures appeared as the excavation process. False metal roofs, walkways as a scaffolding and use the grid as a module archaeological compositional form an open space and seemingly ephemeral characteristic of the process of excavation. The wall treatment based meshes that contain within them even closer boulder space vacuum created by an archaeological excavation. Following a tour
enabled through the remains we enter the exhibition hall of the museum, located in the excavated area with no archaeological remains. It will present all findings in the excavations properly restored, as will generate a temporary exhibition hall. The tour ends at the foot of the castellum aquae, from which can be seen in all its glory as imposing remains brought to light. This room is built on an archaeological garden where plants will own the ages that recreated in the museum (Roman species, irrigation and drainage systems of the Arab period, value of the wells, ...). On the deck of the remains is recreated by a sheet of water, the natural border of the Roman city that was built in contact with the river and marked on the pavement all the remains found with brief explanations to bring their experience to the walker.

The project has been divided into two phases. Today is the first being completed to build the museum and the upper building housing the recreation areas, administration and apartments.

We are in the spa, in the "city of waters", before an overall solution to twin and shows the current frame built on the Roman pattern. An example of how it is possible to further develop the city maintaining its essence and their needs and incorporating both the history as an important and consistent.